Testing new boards
These instructions will guide you through verifying some of the basic connections and functionalities. It's advised to go through the next steps before installing the main connector
| # | Task | Link |
|---|---|---|
| 1 | Measure resistance between: TODO: verify measurement points | |
| 2 | Connect USB and verify: 3v3, Power LED | |
| 3 | Connect +12v and verify 5v | |
| 4 | Write FW to processor | Updating |
| 5 | Verify that the Status LED is green (first power up writes the default config) |
|
| 6 | Enable each output in dingoConfig. Verify that the output current values are 0 | |
| 7 | Measure +12V at each output pad |